Seismo L16R and L24R setup: uncrating, take-up reel, cooling fan and power

✓ Reviewed by Jason KimUpdated 2 min readFits: Seismo L16R · Seismo L24R
Short answer

Have a grounded 220 V circuit ready before the shaker arrives (the L16R is rated 16 A, the L24R 24 A) and plan on four people to slide it off the pallet. Bolt on the take-up brackets and cooling fan loosely, center everything, then tighten. Turn on the main breaker behind its cover panel and confirm the touch screen loads before you feed film.

Before the machine arrives

  • Power: a grounded 220 V supply sized for your model. Have an electrician check the circuit, the wire size and that live and neutral are wired correctly.
  • Location: a level floor, out of direct cold airflow from air conditioning, away from heaters and out of direct sunlight. Cold air blowing on the shaker can stop the powder from curing properly.
  • Room: DTF Station recommends 20 to 28°C (68 to 82°F) and 40 to 60% relative humidity.
  • Tools: Allen key, flat and Phillips screwdrivers, pliers, scissors and a snap blade.

Step by step

  1. Open the crate

    Push the metal prongs on the lid up with a flat screwdriver, straighten them with pliers and lift the lid off. Release the side prongs the same way. Keep the plastic covers for later.

  2. Get it off the pallet

    Remove the bolts that hold the machine to the pallet with the Allen key. With at least four people, slide it off. Check every box of parts against the packing list before you throw anything away.

  3. Fit the take-up brackets

    The left and right brackets are told apart by the direction of their notch. Bolt each one on with its four M6 screws, but leave them slightly loose until everything is lined up.

  4. Install the cooling fan

    Pull the fan brackets all the way out before you fix them. Set the fan on the brackets, start its bolts loosely, position it, then hand-tighten. The fan's power connector turns clockwise to lock.

  5. Install the take-up bars and reel

    Put the first bar through the inner holes and center it. Slide the take-up units onto the second bar and fit it in the outer holes, with the take-up power cable routed on the right side. Spread the take-up units evenly, fit the paper core, center everything, then fully tighten all screws with the Allen key.

  6. Remove the internal packing

    Unlock the four latches, lift the heating elements and take out all shrink wrap, foam and protective film. When you close the lid, lower it halfway and release the safety slot by hand before closing it fully.

  7. Charge the handheld vacuum

    Plug in the included vacuum cleaner on day one. You'll use it in the end-of-day cleanup.

  8. Power up

    Connect power. The main breaker sits behind a small panel held by two bolts: open it, switch the breaker on and close the panel. Turn the shaker on and confirm the touch screen loads its main screen.

Line it up with the printer

Raise the front heating plate so the film rests against it, and center the shaker on the film using the front heating plate as your reference, not the printer. DTF Station's manual calls for about 200 mm (8 in) between the film under the printer and the shaker. The film should lie flat against the front plate and must not hang past its edge, or part of the print won't be heated evenly. Lock the wheels once it's in place.

Always pause the printer before you move or adjust the film, so the print head can't strike it. Until the film reaches the take-up core, keep the rear cover open and stay with the machine. DTF Station's manual warns of a fire risk otherwise. Close the rear cover once the film is taped to the core.

If anything won't power on or the screen won't load, stop there and text us a photo or short video at (562) 609-4996.

Watch DTF Station's video: Seismo L16R and L24R initial setup

Embedded from the manufacturer's official channel.

Common questions

Can I plug a Seismo L16R or L24R into a normal wall outlet?

No. Both run on 220 V. DTF Station rates the L16R at 3.5 kW and 16 A and the L24R at 5.2 kW and 24 A. A power cord may not be included, and depending on local code the machine may need to be hard-wired by an electrician. It must be grounded before you turn it on.

How many people does it take to unload?

At least four to slide it off the pallet once the bolts are out. Keep it level while you move it.

What is the loose ground wire for?

Leave it as it is. If static makes the film or powder misbehave, attach it to the front heating plate.

Should I keep the crate and plastic covers?

Yes. The plastic covers make good dust covers, and the crate is worth keeping in case the machine ever has to ship.

The screen shows the DTF Station logo and then goes dark. Did I set it up wrong?

Almost certainly not. That is a known touch screen fault with a firmware reset fix. Text us and we'll walk you through it.